| Issue | Title | |
|---|---|---|
| Vol 2, No 3 (2014): | EVALUASI KINERJA STRUKTUR GEDUNG BERTINGKAT DENGAN ANALISIS DINAMIK TIME HISTORY MENGGUNAKAN ETABS (STUDI KASUS: HOTEL DI DAERAH KARANGANYAR) | Abstract PDF (Bahasa Indonesia) |
| Wandrianto Anggen, Agus Setiya Budi, Purnawan Gunawan | ||
| Vol 1, No 3 (2013): September 2013 | EVALUASI KINERJA STRUKTUR GEDUNG BERTINGKAT DENGAN ANALISIS DINAMIK TIME HISTORY MENGGUNAKAN ETABS (STUDI KASUS: HOTEL DI DAERAH KARANGANYAR) | Abstract PDF (Bahasa Indonesia) |
| Wandrianto S. Anggen1, Agus Setiya Budi, Purnawan Gunawan | ||
| Vol 2, No 1 (2014): Maret 2014 | EVALUASI KINERJA STRUKTUR GEDUNG BERTINGKAT DENGAN ANALISIS RIWAYAT WAKTU TERHADAP DRIFT DAN DISPLACEMENT MENGGUNAKAN SOFTWARE ETABS (STUDI KASUS : HOTEL DI DAERAH KARANGANYAR) | Abstract PDF (Bahasa Indonesia) |
| Firman Andriyanto, Agus Setiya Budi, Wibowo Wibowo | ||
| Vol 3, No 4 (2015): Desember 2015 | EVALUASI KINERJA STRUKTUR GEDUNG DENGAN ANALISIS PUSOVER (STUDI KASUS: GEDUNG BEDAH SENTRAL TERPADU RUMAH SAKIT BETHESDA YOGYAKARTA) | Abstract PDF (Bahasa Indonesia) |
| Masbudi Masbudi, Edy Purwanto, Agus Supriyadi | ||
| Vol 3, No 4 (2015): Desember 2015 | EVALUASI KINERJA STRUKTUR GEDUNG DENGAN ANALISIS TIME HISTORY (STUDI KASUS: GEDUNG RUMAH SAKIT BETHESDA YOGYAKARTA) | Abstract PDF (Bahasa Indonesia) |
| Listyorini Listyorini, Edy Purwanto, Agus Supriyadi | ||
| Vol 2, No 1 (2014): Maret 2014 | EVALUASI KINERJA STRUKTUR PADA GEDUNG BERTINGKAT DENGAN ANALISIS DINAMIK RESPON SPEKTRUM MENGGUNAKAN SOFTWARE ETABS ( STUDI KASUS : HOTEL DI WILAYAH KARANGANYAR ) | Abstract PDF (Bahasa Indonesia) |
| Muhammad Luthfi Rifai, Agus Setiya Budi, Wibowo Wibowo | ||
| Vol 2, No 1 (2014): Maret 2014 | EVALUASI KINERJA STRUKTUR PADA GEDUNG BERTINGKAT DENGAN ANALISIS PUSHOVER MENGGUNAKAN SOFTWARE ETABS ( STUDI KASUS : HOTEL DI WILAYAH KARANGANYAR ) | Abstract PDF (Bahasa Indonesia) |
| Ibnu Khaldun Riantoby, Agus Setiya Budi, Edy Purwanto | ||
| Vol 1, No 2 (2013): Juni 2013 | EVALUASI KINERJA STRUKTUR PADA GEDUNG BERTINGKAT DENGAN ANALISIS RIWAYAT WAKTU MENGGUNAKAN SOFTWARE ETABS V 9.5 ( STUDI KASUS : GEDUNG SOLO CENTER POINT ) | Abstract PDF (Bahasa Indonesia) |
| Dian Ayu Angling Sari, Edy Purwanto, Wibowo Wibowo | ||
| Vol 1, No 1 (2013): | EVALUASI KINERJA STRUKTUR PADA GEDUNG BERTINGKAT DENGAN ANALISIS RIWAYAT WAKTU MENGGUNAKAN SOFTWARE ETABS V 9.5 ( STUDI KASUS : GEDUNG SOLO CENTER POINT ) | Abstract |
| Ismailah Nur Elliza, Edy Purwanto, Wibowo Wibowo | ||
| Vol 8, No 2 (2020): Juni | EVALUASI KONDISI JALAN DENGAN METODE PSI (PRESENT SERVICEABILITY INDEX) DAN PREDIKSI PENURUNAN UMUR LAYAN (STUDI KASUS: RUAS JALAN SURAKARTA-GEMOLONG-GEYER BTS KABUPATEN GROBOGAN) | Abstract PDF (Bahasa Indonesia) |
| Prima Anugerah Maharyono, Ary Setyawan, Slamet Jauhari Legowo | ||
| Vol 2, No 1 (2014): Maret 2014 | EVALUASI KONDISI JALAN SALATIGA-SRUWEN KM. SMG 57+050 - KM. SMG 59+050 TERHADAP KATEGORI RESIKO TERJADINYA KECELAKAAN | Abstract PDF (Bahasa Indonesia) |
| Sutari Setyowati, Ary Setyawan, Djumari Djumari | ||
| Vol 10, No 1 (2022): Maret | Evaluasi Layanan Instalasi Pengolahan Air Limbah ( IPAL ) Pucangsawit Di Jebres, Surakarta | Abstract PDF (Bahasa Indonesia) |
| Russell Pande Lemuel, Budi Utomo, Siti Qomariyah | ||
| Vol 5, No 3 (2017): September 2017 | Evaluasi Nilai EMP MKJI dan EMP Time Headway pada Simpang Bersinyal dengan Validitas Panjang Antrian (Stadi Kasus pada Simpang Bersinyal Kerten Surakarta) | Abstract PDF (Bahasa Indonesia) |
| Agus Sumarsono, Amirotul MH Mahmudah, Eko Yulistianto | ||
| Vol 11, No 1 (2023): Maret | EVALUASI NILAI KONDISI FUNGSIONAL PERKERASAN JALAN NASIONAL DENGAN METODE PAVEMENT CONTION INDEX (PCI) (Studi Kasus : Ruas Jalan Lingkar Demak, Jalan Losari (Batas Prov. Jawa Barat)-Pejagan, dan Jalan Batas Kota Rembang-Bulu (batas Prov. Jawa Timur)) | Abstract PDF (Bahasa Indonesia) |
| Ary Setyawan, Fajar Sri Handayani, Asteria Nadhia Kusumaningtyas | ||
| Vol 5, No 4 (2017): Desember 2017 | EVALUASI NILAI KONDISI PERKERASAN JALAN NASIONAL DENGAN METODE PAVEMENT CONDITION INDEX (PCI) DAN METODE BENKELMAN BEAM (BB) (Studi Kasus: Ruas Jalan Pakem-Prambanan) | Abstract PDF (Bahasa Indonesia) |
| Ibnu Setiadi, Ary Setyawan, Suryoto Suryoto | ||
| Vol 5, No 3 (2017): September 2017 | EVALUASI NILAI KONDISI PERKERASAN JALAN NASIONAL DENGAN METODE PAVEMENT CONDITION INDEX (PCI) DAN METODE FALLING WEIGHT DEFLECTOMETER (FWD) (Studi Kasus: Ruas Jalan Klaten-Prambanan) | Abstract PDF (Bahasa Indonesia) |
| Daniel Aviyanto Pratama, Ary Setyawan, Suryoto Suryoto | ||
| Vol 11, No 1 (2023): Maret | EVALUASI NILAI KONDISI PERKERASAN JALAN NASIONAL DENGAN METODE PAVEMENT CONDITION INDEX (PCI) (Studi Kasus : Ruas Jalan Lingkar Demak, Jalan Losari (Batas Prov. Jawa Barat)-Pejagan, dan Jalan Batas Kota Rembang-Bulu (batas Prov. Jawa Timur)) | Abstract PDF (Bahasa Indonesia) |
| Ary Setyawan, Ory Febriayani, Fajar Sri Handayani | ||
| Vol 7, No 1 (2019): Maret | EVALUASI NILAI KONDISI PERKERASAN JALAN NASIONAL DENGAN METODE PAVEMENT CONDITION INDEX (PCI) MENGGUNAKAN APLIKASI ROAD EVALUATION AND MONITORING SYSTEM (REMS) (Studi Kasus : Ruas Jalan Prambanan - Pakem). | Abstract PDF (Bahasa Indonesia) |
| Fakhri Muhammad, Ary Setyawan, Suryoto Suryoto | ||
| Vol 6, No 4 (2018): DESEMBER 2018 | EVALUASI NILAI KONDISI PERKERASAN JALAN NASIONAL DENGAN METODE PAVEMENT CONDITION INDEX (PCI) MENGGUNAKAN APLIKASI ROAD EVALUATION AND MONITORING SYSTEM (REMS) (Studi Kasus : Ruas Jalan Surakarta - Sragen) | Abstract PDF (Bahasa Indonesia) |
| Manuel Simeon Marpaung, Ary Setyawan, Suryoto Suryoto | ||
| Vol 11, No 1 (2023): Maret | EVALUASI NILAI KONDISI PERKERASAN JALAN NASIONAL DENGAN METODE PAVEMENT CONDITION INDEX (PCI) (Studi Kasus : Ruas Jalan Simpang 3 Lingkar Kudus Timur-Batas Kabupaten Pati/Kudus, Ruas Jalan Lingkar Pati, dan Ruas Jalan Wangon-Menganti) | Abstract PDF (Bahasa Indonesia) |
| Ary Setyawan, Fajar Sri Handayani, Adellona Merry Islamia | ||
| Vol 11, No 1 (2023): Maret | EVALUASI NILAI KONDISI PERKERASAN JALAN NASIONAL DENGAN METODE PAVEMENT CONDITION INDEX (PCI) (Studi Kasus: Simpang 3 Lingkar Kudus Timur – Batas Kabupaten Pati / Kudus, Jalan Lingkar Pati, dan Wangon – Menganti) | Abstract |
| Ary Setyawan, Fajar Sri Handayani, Pilang Maharani Pramono | ||
| Vol 3, No 1 (2015): Maret 2015 | EVALUASI PANJANG ANTRIAN KENDARAAN PADA PELAYANAN PINTU KELUAR PARKIR DENGAN ATAU TANPA PERUBAHAN PINTU KELUAR PARKIR DI SOLO GRAND MALL | Abstract PDF (Bahasa Indonesia) |
| Hendra Wahyu Kurniawan, Agus Sumarsono, Amirotul Musthofiah Mahmudah | ||
| Vol 3, No 2 (2015): Juni 2015 | EVALUASI PANJANG ANTRIAN KENDARAAN PADA PELAYANAN PINTU KELUAR PARKIR DI HARTONO LIFESTYLE MALL SOLO BARU | Abstract PDF (Bahasa Indonesia) |
| Alfi Rizqi Mazidah, Agus Sumarsono, Djumari Djumari | ||
| Vol 2, No 4 (2014): | EVALUASI PENERAPAN SISTEM PROTEKSI KEBAKARAN PADA BANGUNAN RUMAH SAKIT (Studi Kasus RS. Ortopedi Prof. Dr. R. Soeharso Surakarta) | Abstract PDF (Bahasa Indonesia) |
| Primanda Arief Kurniawan, Sugiyarto Sugiyarto, Budi Laksito | ||
| Vol 1, No 2 (2013): Juni 2013 | EVALUASI PENERAPAN TARIF ANGKUTAN UMUM KERETA API (STUDI KASUS KERETA API MADIUN JAYA EKSPRES) | Abstract PDF (Bahasa Indonesia) |
| Maya Fricilia, Slamet Jauhari Legowo | ||
| 351 - 375 of 1128 Items | << < 10 11 12 13 14 15 16 17 18 19 > >> | |





