Issue |
Title |
Vol 15, No 2 (2016): PERFORMA Vol. 15 No. 2, September 2016 |
Perancangan Sistem Pengukuran Kerja dengan Metode Intergrated Performance Measurement System (IPMS) (Studi Kasus: CV. Ekasari) |
Abstract
PDF
|
Indah Kurniyati, Risya Zeline, Sri Yohana Simanjuntak, Yuniaristanto - |
Vol 11, No 2 (2012): PERFORMA Vol. 11, No 2 September 2012 |
Perancangan Key Performance Indicators (KPI) Menggunakan Metode Performance Prism (Studi Kasus di Batik Putra Bengawan) |
Abstract
PDF
|
Murman Budijanto, Yusuf Priyandari, Santi Embun Sari |
Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014 |
Perancangan Key Performance Indicators (KPI) Menggunakan Metode Balanced Scorecard di PT. Aston System Indonesia |
Abstract
PDF
|
Febrinata -, Murman Budijanto, Irwan Iftadi |
Vol 12, No 2 (2013): PERFORMA Vol. 12, No 2 September 2013 |
Perancangan Key Performance Indicators Menggunakan Metode Performance Prism |
Abstract
PDF
|
Eko Supriyadi, Murman Budijanto, Irwan Iftadi |
Vol 15, No 2 (2016): PERFORMA Vol. 15 No. 2, September 2016 |
Pengukuran Kinerja Perusahaan Menggunakan Metode Performance Prism (Studi Kasus di Cendana Offset Fokus Intermedia Grup) |
Abstract
PDF
|
Anissa Rianda Putri, Azmi Mas’ud, Selvia Mayangsari, Yuniaristanto - |
Vol 15, No 2 (2016): PERFORMA Vol. 15 No. 2, September 2016 |
Pengukuran Kinerja dengan Metode Balance Scorecard pada Perusahaan Printpro |
Abstract
PDF
|
Yuniaristanto -, Irfan Hilmi Hamdani, Niken Aristyawati, Galuh Qodrina |
Vol 9, No 1 (2010): PERFORMA Vol. 9, No. 1 Maret 2010 |
Perancangan Sistem Pengukuran Kinerja Organisasi Non Profit (Studi Kasus pada UTDC PMI Surakarta) |
Abstract
PDF
|
Wakhid Ahmad Jauhari, Eko Liquiddanu, Eka Agustina Nugraheni |
Vol 7, No 2 (2008): PERFORMA Vol. 7, No. 2 September 2008 |
Usulan Model Pengukuran Kinerja Rantai Suplai untuk Meminimalkan Keterlambatan pada Pengiriman ONS |
Abstract
PDF
|
Wahyudi Sutopo, Widha Windhira, Yuniaristanto - |
Vol 5, No 1 (2006): PERFORMA Vol. 5, No. 1 Maret 2006 |
Pengembangan Usulan Proses Bisnis Terintegrasi Produk Air Minum Ciryo dengan Konsep Business Process Reengineering Di CV. Titian Mandiri |
Abstract
PDF
|
Wahyudi Sutopo, Muh. Hisjam, Laily Marhana |
Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005 |
Perancangan Sistem Pengukuran Kinerja Pada Perguruan Tinggi Swasta XYZ Dengan Metode Balanced Scorecard |
Abstract
PDF
|
Wahyudi Sutopo, Eko Liquiddanu, Endah Sulistyowati |
1 - 10 of 10 Items |
|