Skip to Main Content
Login Register
Page Header
  • Home
  • About
  • Categories
  • Current
  • Archives
  • Announcements
  • Statistics
  • Contact
  • Submission
  • Publication Ethics
  • Login
  • Register
MAIN MENU
  • Home
  • About
  • Categories
  • Search
  • Current
  • Archive
  • Announcements
  • Submit
  • Statistics
  • Contact
  • Submission
  • Publication Ethics

Journal Template

Download Template

Indexed By

Sinta

Dimensions

 

Checked By

Turnitin

Mendeley

Visitors Flag Counter

 

Web Analytics Made Easy - Statcounter

View My Stats

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Keywords Aggregate, Marshall, Specific Gravity, Stability Budget Plan, Conventional Method, Modular Method, Time COVID-19 Clayey soil, Subgrade soil, Bearing capacity, CBR Construction Work Volume, Budget Plan, Building Information Modelling (BIM), Cubicost Earned Value, Cost, Schedule, Primavera P6 Flood, Drainage capacity, HEC-RAS, SCS GeoStudio Groundwater, ARCGIS Modeling, Water Quality Kuat Tekan Kuat Tekan, Densitas, Mortar, Abu Batu, Limbah Landslide, Soil Type, Soil Consistency, Sliding Angle, Safety Factor Occupational Accident Risks, Probability, Severity, Bowtie Method Porosity, Compressive Strength, Master Glenium Ace 8595 Risk, Drought, RWH, Karawang Sociodemographic Attributes Transportation Mode floods, return period discharge, flood mapping, flood vulnerability infiltration wells, LID, sustainable drainage, cost performance, earthquake, pushover, stiffness, displacement permeabiltas
Notifications
  • View
  • Subscribe
Journal Content

Browse
  • By Issue
  • By Author
  • By Title
  • Other Journals
  • Categories
User
Home / Archives / Vol 8, No 1 (2024)

Vol 8, No 1 (2024)

September 2024

Table of Contents

Vol 8 No 1 (2024)

PENDEKATAN PEMBANGUNAN DAMPAK RENDAH UNTUK SUMUR RESAPAN DAN ANALISIS BIAYA INVESTASINYA DI WILAYAH PERKOTAAN
Oktavia Kurnianingsih, Delista Putri Deni
https://dx.doi.org/10.20961/jrrs.v8i1.95312
PDF
1-8
ANALISIS EARNED VALUE TERHADAP BIAYA DAN WAKTU GEDUNG DIREKTORAT POLITEKNIK PU SEMARANG DENGAN PRIMAVERA P6
Noel Eka Nugraha, Fajar Sri Handayani, Setiono Setiono
https://dx.doi.org/10.20961/jrrs.v8i1.85304
PDF
9-17
PERBANDINGAN BIAYA DAN WAKTU ANTARA METODE KONVENSIONAL DENGAN METODE MODULAR MENGGUNAKAN MICROSOFT PROJECT
Nabila Yusriyya Huwaida, Fajar Sri Handayani, Muji Rifai
https://dx.doi.org/10.20961/jrrs.v8i1.95314
PDF
18-26
OPTIMASI DISTRIBUSI AIR IRIGASI MELALUI SISTEM GOLONGAN (STUDI KASUS DAERAH IRIGASI RONGKONG SELUAS 27.000 HA)
Muji Rifai, Agus Hari Wahyudi
https://dx.doi.org/10.20961/jrrs.v8i1.95315
PDF
27-36
PENGARUH KADAR AKTIVATOR DAN RASIO SS/SH PADA BETON GEOPOLIMER TERHADAP KUAT TEKAN
Agus Setiya Budi, Jericho Fernandez Tampubolon
https://dx.doi.org/10.20961/jrrs.v8i1.98780
PDF
37-44
Civil Engineering Department

Jalan Ir. Sutami No. 36 A Surakarta, Jawa Tengah Indonesia, 57126

+6281112633314 / +62271634524

sipil@ft.uns.ac.id
Universitas Sebelas Maret Logo