Skip to Main Content
Login Register
Page Header
  • Home
  • About
  • Categories
  • Current
  • Archives
  • Announcements
  • Statistics
  • Contact
  • Submission
  • Publication Ethics
  • Login
  • Register
MAIN MENU
  • Home
  • About
  • Categories
  • Search
  • Current
  • Archive
  • Announcements
  • Submit
  • Statistics
  • Contact
  • Submission
  • Publication Ethics
Language

Journal Template

Download Template

Indexed By

Sinta

Dimensions

 

Checked By

Turnitin

Mendeley

Visitors Flag Counter

 

Web Analytics Made Easy - Statcounter

View My Stats

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Information
  • For Readers
  • For Authors
  • For Librarians
Font Size

Keywords BIM, Cubicost, Regression, TAS, Validity Budget Plan, Conventional Method, Modular Method, Time Clayey soil, Subgrade soil, Bearing capacity, CBR Earned Value, Cost, Schedule, Primavera P6 Flood, Drainage capacity, HEC-RAS, SCS Kali Pepe, PERSIANN, Hujan Satelit, Kalibrasi, Debit Periode Ulang Landslide, Soil Type, Soil Consistency, Sliding Angle, Safety Factor Occupational Accident Risks, Probability, Severity, Bowtie Method Permasalahan genangan yang terus meningkat di kawasan perkotaan. Strategi mitigasi banjir konvensional belum sepenuhnya efektif. Genangan hanya dianggap sebagai dampak pasif dari sistem drainase yang gagal. Penelitian ini bertujuan mengkaji strategi mitig Surakarta City, TRMM, Three-Day Rainfall, River Runoff The 5- Why’s Method, Borda Method, Lean Construction, Root Cause Analysis, Waste comparison, flexible pavement, Component Analysis, Highways 2017 dependable flow, GPM, NRECA, rainfall, validation. floods, return period discharge, flood mapping, flood vulnerability he trans jateng bus, buy the service, importance-performance analysis infiltration wells, LID, sustainable drainage, cost irigasi, rotasi teknis, sistem golongan, water management performance, earthquake, pushover, stiffness, displacement single pile foundation, axial load, lateral load, combine load, vertical settlement sumur resapan tanah porus
Notifications
  • View
  • Subscribe
Journal Content

Browse
  • By Issue
  • By Author
  • By Title
  • Other Journals
  • Categories
User
Current Issue Atom logo
RSS2 logo
RSS1 logo
Home / Archives / Vol 8, No 1 (2024)

Vol 8, No 1 (2024)

September 2024

Table of Contents

Vol 8 No 1 (2024)

PENDEKATAN PEMBANGUNAN DAMPAK RENDAH UNTUK SUMUR RESAPAN DAN ANALISIS BIAYA INVESTASINYA DI WILAYAH PERKOTAAN
Oktavia Kurnianingsih, Delista Putri Deni
https://dx.doi.org/10.20961/jrrs.v8i1.95312
PDF
1-8
ANALISIS EARNED VALUE TERHADAP BIAYA DAN WAKTU GEDUNG DIREKTORAT POLITEKNIK PU SEMARANG DENGAN PRIMAVERA P6
Noel Eka Nugraha, Fajar Sri Handayani, Setiono Setiono
https://dx.doi.org/10.20961/jrrs.v8i1.85304
PDF
9-17
PERBANDINGAN BIAYA DAN WAKTU ANTARA METODE KONVENSIONAL DENGAN METODE MODULAR MENGGUNAKAN MICROSOFT PROJECT
Nabila Yusriyya Huwaida, Fajar Sri Handayani, Muji Rifai
https://dx.doi.org/10.20961/jrrs.v8i1.95314
PDF
18-26
OPTIMASI DISTRIBUSI AIR IRIGASI MELALUI SISTEM GOLONGAN (STUDI KASUS DAERAH IRIGASI RONGKONG SELUAS 27.000 HA)
Muji Rifai, Agus Hari Wahyudi
https://dx.doi.org/10.20961/jrrs.v8i1.95315
PDF
27-36
PENGARUH KADAR AKTIVATOR DAN RASIO SS/SH PADA BETON GEOPOLIMER TERHADAP KUAT TEKAN
Agus Setiya Budi, Jericho Fernandez Tampubolon
https://dx.doi.org/10.20961/jrrs.v8i1.98780
PDF
37-44
Penerbit: Prodi Teknik Sipil FT UNS

Jalan Ir. Sutami No. 36 A Surakarta, Jawa Tengah Indonesia, 57126

+6281112633314 / +62271634524

sipil@ft.uns.ac.id
Universitas Sebelas Maret Logo