PERBANDINGAN BIAYA DAN WAKTU ANTARA METODE KONVENSIONAL DENGAN METODE MODULAR MENGGUNAKAN MICROSOFT PROJECT
Abstract
Indonesia's construction sector is experiencing rapid growth, this proven by numerous development projects, including a sub-district building construction project, aiming to optimize community services. A project must have three aspects, namely cost, quality and time. Choosing an implementation method is very important so that a project can achieve these three goals. The research method used a quantitative descriptive approach with the aim of comparing cost and time aspects between conventional methods and modular methods. The conventional approach involves working on site using conventional building materials, while the modular approach involves the use of pre-fabricated modules. In analyzing the costs and time of construction of the Grabag Sub-district office building, Purworejo Regency, Microsoft project application was used to calculate the duration of the work. The cost analysis show that building structure work using the conventional method costs Rp.3,086,929,413.11, while the modular method costs Rp.3,646,018,620.52. So the difference in the cost of construction work is Rp.559,089,207.42 or 18.11% higher for work using the modular method. The time analysis obtained building structure work using conventional methods require 150 days while the modular method is 87 days or time efficiency of 63 days or 42% lower for work with modular methods. The results of the Time Cost Trade Off (TCTO) calculation showed that the total project cost for conventional construction was Rp.2,781,017,489 while the cost for modular construction was Rp.3,117,530,328. So a difference of Rp.336,512,839 is higher for modular construction. Therefore, conventional construction is the most economical option for the sub-district building.
Keywords
Full Text:
PDFReferences
Adinda, N. R. (2014). Aplikasi Teknologi Pabrikasi Rumah Modular. Isu Teknologi, 7(1), 15–25.
Atsaruddin, A. T., Negara, K. P., & Unas, S. El. (2019). PERBANDINGAN RENCANA ANGGARAN BIAYA RUMAH M-PANEL DENGAN RUMAH KONVENSIONAL PROYEK PEMBANGUNAN RUMAH TIPE 60/99 PONDOK PERMATA SUCI GRESIK.
Fadilah, A. R. (2018). STUDI PERBANDINGAN BIAYA DAN WAKTU DENGAN METODE KONVENSIONAL DAN B-PANEL COMPARISON STUDY OF COST AND TIME WITH CONVENTIONAL AND B-PANEL METHODS.
Crista, N. H. (2010). ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN METODE RISBA DAN METODE KONVENSIONAL PADA STRUKTUR BANGUNAN RUMAH TINGGAL. 03, 1–13.
Generalova, E. M., Generalov, V. P., & Kuznetsova, A. A. (2016). Modular Buildings in Modern Construction. Procedia Engineering, 153, 167–172. https://doi.org/10.1016/j.proeng.2016.08.098
Hammad, A. W., Akbarnezhad, A., Wu, P., Wang, X., & Haddad, A. (2019). Building information modelling-based framework to contrast conventional and modular construction methods through selected sustainability factors. Journal of Cleaner Production, 228, 1264–1281. https://doi.org/10.1016/j.jclepro.2019.04.150
Hidayat, F. (2018). Analisis Perbandingan Biaya, Waktu, Material, Dan Tata Laksana Pekerjaan Dinding Menggunakan Bata Ringan, Sandwich Panel Dan Beton Precast Pada Proyek Pembangunan Rumah Sakit “Stc” Di Kota Jakarta. Jurnal Teknik Sipil, 7(2), 40–51. https://doi.org/10.24815/jts.v7i2.11221
Huang, J. C. H., Krawczyk, R. J., & Schipporeit, G. (2006). Mass customizing prefabricated modular housing by internet-aided design. CAADRIA 2006 - The Association for Computer-Aided Architectural Design Research in Asia: Rhythm and Harmony in Digital Space, 203–208. https://doi.org/10.52842/conf.caadria.2006.x.c8r
Ibrahim, H. B. (2001). Rencana Dan Estimasi Real of Cost (III). PT Bumi Aksara.
Jamal, M., Budiman, E., Studi, P., Sipil, T., Teknik, F., Mulawarman, U., Program, P., Sipil, S., Teknik, F., Mulawarman, U., Kelua, K. G., Program, P., Teknik, S., Teknik, F., Mulawarman, U., Kelua, K. G., Pattimura, B., & Proyek, M. (2021). Konvensional Dengan Sandwich Panel Pada Perluasan. 5(November), 42–49.
Kementrian Pekerjaan Umum. (2022). Bagian IV: Analisa Harga Satuan Pekerjaan (AHSP) Bidang Cipta Karya dan Perumahan: Vol. A.4.1.1.13. jdih.pu.go.id
Muzakkii, M. D., & Mahardho, F. T. (2020). Tutorial Pembuatan Rencana Anggaran Biaya Dan Penjadwalan Proyek.
Putri, S. Y., & Setiawan, A. (2017). Perbandingan Dinding Prefab Cement Wall Dengan. Seminar Nasional Sains Dan Teknologi, November, 1–2.
Susanto, S. (2019). The Study of Prefabricated Construction Methods for Mass Tread Housing Construction. Case Study: Dian Sukolilo Regency Housing, Surabaya. Dimensi Utama Teknik Sipil, 6(2), 49–63. https://doi.org/10.9744/duts.6.2.49-63
Taofik, A., & Astuti, S. (2018). Pembangunan dengan Sistem Industri Modular dan Sistem Konvensional. C077–C080. https://doi.org/10.32315/ti.7.c077
Wulfarm I, E. (2005). Manajemen Proyek Konstruksi Edisi Ketiga (III). Andi. http://katalog.kemdikbud.go.id/index.php?p=show_detail&id=91316
Refbacks
- There are currently no refbacks.