Skip to Main Content
Login Register
Page Header
  • Home
  • About
  • Categories
  • Current
  • Archives
  • Announcements
  • Statistics
  • Contact
  • Submission
  • Publication Ethics
  • Login
  • Register
MAIN MENU
  • Home
  • About
  • Categories
  • Search
  • Current
  • Archive
  • Announcements
  • Submit
  • Statistics
  • Contact
  • Submission
  • Publication Ethics
Language

Journal Template

Download Template

Indexed By

Sinta

Dimensions

 

Checked By

Turnitin

Mendeley

Visitors Flag Counter

 

Web Analytics Made Easy - Statcounter

View My Stats

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Information
  • For Readers
  • For Authors
  • For Librarians
Font Size

Keywords BIM, Cubicost, Regression, TAS, Validity Budget Plan, Conventional Method, Modular Method, Time Clayey soil, Subgrade soil, Bearing capacity, CBR Earned Value, Cost, Schedule, Primavera P6 Flood, Drainage capacity, HEC-RAS, SCS Kali Pepe, PERSIANN, Hujan Satelit, Kalibrasi, Debit Periode Ulang Landslide, Soil Type, Soil Consistency, Sliding Angle, Safety Factor Occupational Accident Risks, Probability, Severity, Bowtie Method Permasalahan genangan yang terus meningkat di kawasan perkotaan. Strategi mitigasi banjir konvensional belum sepenuhnya efektif. Genangan hanya dianggap sebagai dampak pasif dari sistem drainase yang gagal. Penelitian ini bertujuan mengkaji strategi mitig Surakarta City, TRMM, Three-Day Rainfall, River Runoff The 5- Why’s Method, Borda Method, Lean Construction, Root Cause Analysis, Waste comparison, flexible pavement, Component Analysis, Highways 2017 dependable flow, GPM, NRECA, rainfall, validation. floods, return period discharge, flood mapping, flood vulnerability he trans jateng bus, buy the service, importance-performance analysis infiltration wells, LID, sustainable drainage, cost irigasi, rotasi teknis, sistem golongan, water management performance, earthquake, pushover, stiffness, displacement single pile foundation, axial load, lateral load, combine load, vertical settlement sumur resapan tanah porus
Notifications
  • View
  • Subscribe
Journal Content

Browse
  • By Issue
  • By Author
  • By Title
  • Other Journals
  • Categories
User
Current Issue Atom logo
RSS2 logo
RSS1 logo
Home / Archives / Vol 1, No 2 (2018)

Vol 1, No 2 (2018)

Maret 2018

Table of Contents

Vol 1 No 2 (2018)

ANALISIS FASILITAS PARKIR DAN AKSESIBILITAS OBYEK WISATA GOA GONG, PACITAN
Sulistiani Sulistiani, Ahmad Munawar
https://dx.doi.org/10.20961/jrrs.v1i2.18122
PDF
71-81 of 113
MODEL LOGIT DAN PROBIT DALAM ANALISIS SENSITIVITAS TARIF TOLO SOLO-NGAWI RUAS KARTASURA-PALANG JOGLO BERDASARKAN WILLINGNESS TO PAY (WTP)
Dewi Handayani, Hera Cahyaning Putri, Amirotul M HM
https://dx.doi.org/10.20961/jrrs.v1i2.20652
82-88 of 113
PEMULIHAN KUAT TEKAN BETON RINGAN BERSERAT ALUMINIUM PASCA BAKAR DENGAN VARIASI WAKTU WATER CURING
Antonius Mediyanto, Endah Safitri
https://dx.doi.org/10.20961/jrrs.v1i2.20654
PDF
89-93 of 113
ANALISIS SIFAT FISIK DAN MEKANIK BATU BATA MERAH DI YOGYAKARTA (Analysis Physical and mechanical attributes of masonry in Yogyakarta)
Hakas Prayuda, Endra Aji Setyawan, Fadillawaty Saleh
https://dx.doi.org/10.20961/jrrs.v1i2.20658
PDF
94-104 of 113
PENINGKATAN KUALITAS pH, Fe DAN KEKERUHAN DARI AIR SUMUR GALI DENGAN METODE FILTRASI
Ahmad Mashadi, Bambang Surendro, Anis Rakhmawati, Muhammad Amin
https://dx.doi.org/10.20961/jrrs.v1i2.20660
PDF
105-113 of 43
Penerbit: Prodi Teknik Sipil FT UNS

Jalan Ir. Sutami No. 36 A Surakarta, Jawa Tengah Indonesia, 57126

+6281112633314 / +62271634524

sipil@ft.uns.ac.id
Universitas Sebelas Maret Logo