PENGAPLIKASIAN BIM 5D UNTUK PEKERJAAN ARSITEKTUR PADA PROYEK GEDUNG IGD RSUD WARAS WIRIS BOYOLALI
Abstract
Building Information Modelling (BIM) is a system for digitizing data processing that can help work in the construction industry run more effectively and efficiently. One type of BIM is 5D BIM. 5D BIM has the function of determining the take-off quantities and analyzing the costs of a building. An example of 5D BIM is Cubicost. Cubicost BIM is a BIM from the Glodon company that allows you to calculate work volumes in a detailed and precise way. In this research, the case study presented is an architectural work on the Waras Wiris Boyolali Hospital Emergency Building Construction Project. The architectural section was selected because architectural works play an important role in nominal terms, so the determination of volume greatly influences construction costs. This research uses Cubicost TAS and TRB software. Cubicost Software's volume results have also been validated so that they show a 99% correlation figure with volume obtained from conventional calculations. Based on the research carried out, the cost of using Cubicost software for architectural works in the Waras Wiris Boyolali Emergency Hospital Building Construction Project is Rp. 1.695.645.165,47. Using the Cubicost software also produces an efficiency of 11.550% on RAB from the consultant.
Keywords
Full Text:
PDFReferences
Adhyaksa. (n.d.). Mengenal Cubicost Sebagai Software Bidang Kontsruksi. Adhyaksa Persada Indonesia. https://www.adhyaksapersada.co.id/apa-itu-cubicost
Anindya, A. A., & Gondokusumo, O. (2020). Kajian Penggunaan Cubicost Untuk Pekerjaan Quantity Take Off Pada Proses Tender. Jurnal Muara Sains, Teknologi, Kedokteran Dan Ilmu Kesehatan, 4(1), 83. https://doi.org/10.24912/jmstkik.v4i1.6718
Badan Pengembangan Sumber Daya Manusia Pusat Pendidikan Dan Pelatihan Sumber Daya Air Dan Konstruksi, P. (2018). Pelatihan Perencanaan Konstruksi Dengan Sistem Teknologi Building Information Modeling (BIM) MODUL. 1, 1–125.
http://www.tfd.org.tw/opencms/english/about/background.html%0Ahttp://dx.doi.org/10.1016/j.cirp.2016.06.001%0Ahttp://dx.doi.org/10.1016/j.powtec.2016.12.055%0Ahttps://doi.org/10.1016/j.ijfatigue.2019.02.006%0Ahttps://doi.org/10.1016/j.matlet.2019.04.024%0A
Buwono, A. A. (2023). Mengenal Teknologi Building Information Modeling (BIM) pada Penerapan Proyek Infrastruktur.
https://depobeta.com/magazine/artikel/mengenal-teknologi-building-information-modeling-bim-pada-penerapan-proyek-infrastruktur/
Dinarjito, A. (2022). Struktur Pasar Industri Konstruksi Di Indonesia Tahun 2018-2021. Jurnalku, 2(3), 358–363.
https://doi.org/10.54957/jurnalku.v2i3.279
Direktorat Jenderal Kependudukan Dan Pencatatan Sipil. (2022). 273 Juta Penduduk Indonesia Terupdate Versi Kemendagri. https://dukcapil.kemendagri.go.id/berita/baca/1032/273-juta-penduduk-indonesia-terupdate-versi-kemendagri
Dwi, B., Christopher, A., Wasono, & Suryo, D. (2022). Efisiensi Penggunaan 5D-Bim Terhadap Volume Material Dan Estimasi Biaya Pada Proyek Konstruksi. M, 48–82.
Herzanita, A., & Anggraini, R. P. (2023). Perbandingan Estimasi Biaya Struktur Bangunan Antara Software Autodesk Revit Dengan Cubicost. Construction and Material Journal, 5(1), 1–11. https://doi.org/10.32722/cmj.v5i1.4620
Ilmi, U. (2019). Studi Persamaan Regresi Linear Untuk Penyelesaian Persoalan Daya Listrik. Jurnal Teknika, 11(1), 1083. https://doi.org/10.30736/jt.v11i1.291
Jonathan, R., & Anondho, B. (2021). Perbandingan Perhitungan Volume Pekerjaan Dak Beton Bertulang Antara Metode Bim Dengan Konvensional. Jurnal Mitra Teknik SIpil, 4.
Noviani, S. A., Mawardi Aman, & Sarwono Hardjomuljadi. (2021). Metode Building Information Modelling 5D Untuk Meminimalkan Klaim Konstruksi Yang Ditimbulkan Oleh Penyedia Jasa. Konstruksia, 13(1), 29–42.
Novraindi, I. (2018). Apa Itu Cubicost. https://irman-novriandi.com/apa-itu-cubicost/
Pratama, R. W. (2023). Pengaplikasian Building Information Modeling (BIM) 5D Dengan Perangkat Lunak Cubicost Untuk Menganalisis Perbandingan Volume Dan Biaya Pada Suatu Proyek (Studi Kasus: Proyek Pembangunan Gedung Igd Dan Hd Rsud Waras Wiris Boyolali). Tugas Akhir.
PUPR Banda Aceh, D. (2020). Pengertian BIM (Building Information Modelling). https://dinaspupr.bandaacehkota.go.id/2020/07/29/pengertian-bim-building-information-modelling/
PUPR, K. (2021). Peraturan Pemerintah nomor 16 Tahun 2021 tahun 2021. In PP.
Sangadji, S., Kristiawan, & Saputra, I. K. (2019). Pengaplikasian Building Information Modeling (BIM) Dalam Desain Bangunan Gedung.
Suanda, B. (2020). Building Information Modelling (BIM) dan Sejarahnya.
Sugiyono. (2018). Metode Penelitian Kuantitatif. Alfabeta.
Wibowo, A. (2021). Evaluasi Penerapan Building Information Modeling (Bim) Pada Proyek Konstruksi Di Indonesia. 1–97. http://repository.unissula.ac.id/22223/11/20201800050 fulltext.pdf
Widiasanti, I., Wijaya, M. A., Anggraini, S., Balqis, O. A., Suryapratama, R. Y., & Prasetya, B. T. (2023). Penerapan Building Information Modeling (Bim) 5D pada Manajemen Biaya Proyek dalam Dunia Konstruksi Irika. 6, 256–260. https://doi.org/10.33087/talentasipil.v6i2.299
Yustika, K. I. (2020). Perancangan Value Stream Mapping Pada Proyek Konstruksi Untuk Meminimasi Waste Dan Memaksimalkan Nilai Tambah. Tugas Akhir.
Refbacks
- There are currently no refbacks.