ANALISIS PERBANDINGAN EFEKTIVITAS METODE KONVENSIONAL DAN BIM AUTODESK REVIT DALAM PERENCANAAN KONSTRUKSI GEDUNG
Abstract
Building Information Modeling (BIM) provides a significant improvement in efficiency, accuracy, and coordination compared to conventional 2D-based methods in construction planning and cost estimation. This study employs a descriptive quantitative approach with a comparative method to analyze the effectiveness of conventional and BIM-based methods using Autodesk Revit software in preparing the Quantity Take Off (QTO), Bill of Quantity (BOQ), and Cost Budget Plan (RAB) for the Kerobokan Traditional Village Office Building project in Bali. The secondary data include architectural, structural, and utility design drawings, as well as the 2022 Work Unit Price Analysis (AHSP). The findings indicate that the implementation of BIM reduces project preparation time by 37.72% compared to the conventional method. Furthermore, volume discrepancies were found in concrete work (11.63%), formwork (-5.99%), and reinforcement (36.26%) due to differences in modeling and measurement principles. These results highlight BIM’s crucial role in enhancing estimation accuracy, time efficiency, and design adaptability, particularly in government building projects that must comply with the Ministry of Public Works Regulation No. 22 of 2018 on Cost Budgeting Guidelines.
Keywords: autodesk Revit; BIM; BOQ; cost estimation; QTO.
Full Text:
PDF (Bahasa Indonesia)References
Amri, S. I., Hardyanti, N., & Sumiyati, S. (2023). Analisis Perbandingan Quantity Take Off (QTO) Beton Menggunakan Metode Building Information Modelling (BIM) dan Metode Konvensional (Studi Kasus : Proyek Kantor PNM Cabang Jember). Jurnal Profesi Insinyur Indonesia, 1(6), 225–233. https://doi.org/10.14710/jpii.2023.19025
Anwar, M. R., & Nurchasanah, Y. (2023). Perbandingan Quantity Take-Off Beton Antara Metode Konvensional Dengan Metode Bim Pada Gedung 13 Lantai. Prosiding Seminar Nasional Teknik Sipil, 0–4.
Berlian, C. A. P., Adhi, R. P., Hidayat, A., & Nugroho, H. (2016). Perbandingan Efisiensi Waktu, Biaya, Dan Sumber Daya Manusia Antara Metode Building Information Modelling (BIM) dan Konvensional (Studi Kasus: Perencanaan Gedung 20 Lantai). Jurnal Karya Teknik Sipil, 5(2), 220–229. http://ejournal-s1.undip.ac.id/index.php/jkts
Ferry, F., & Indrastuti, I. (2020). Penerapan Building Information Modelling (Bim) Pada Proyek Pembangunan Workshop (Studi Kasus: Proyek Pembangunan Workshop Kapal Di Sekupang). Journal of Civil Engineering and Planning, 1(1), 7. https://doi.org/10.37253/jcep.v1i1.721
Fikri, A., & Septiropa, Z. (2022). Aplikasi Building Information Modelling (Bim) Dalam Meningkatkan Efektivitas Perhitungan Rencana Anggaran Biaya Struktur. Seminar Keinsinyuran Program Studi Program Profesi Insinyur, 2(1), 216–222. https://doi.org/10.22219/skpsppi.v3i1.5064
Juliani, M. P., & Renaningsih, R. (2023). Analisa Perbandingan Volume Beton Metode Konvensional pada Hasil Bill of Quantity (BQ) dan BIM Autodesk Revit 2020 terhadap Efektifitas Biaya. Prosiding Seminar Nasional Teknik Sipil UMS, 631–637.
Laorent, D., Nugraha, P., & Budiman, J. (2019). Analisa Quantity Take-Off Dengan Menggunakan Autodesk Revit. Dimensi Utama Teknik Sipil, 6(1), 1–8. https://doi.org/10.9744/duts.6.1.1-8
Love PED, Simpson I, Hill A, Standing C. (2013). From justification to evaluation: Building Information Modeling (BIM) for asset owners. Journal of Automation in Construction. 35(2013): 208-216
Ogi, D., Irawan, P., Trisiana, A., & Sukmawati, S. (2021). Penerapan Building Information Modeling (BIM) Dalam Analisis Waktu. Journal of Applied Civil Engineering and Infrastructure (JACEIT), 2(1), 35–39. http://journal.isas.or.id/index.php/JACEIT
Olsen, D., & Taylor, J. M. (2017). Quantity Take-Off Using Building Information Modeling (BIM), and Its Limiting Factors. Procedia Engineering, 196(June), 1098–1105. https://doi.org/10.1016/j.proeng.2017.08.067
PUPR, M. (2018). PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT REPUBLIK INDONESIA NOMOR 22/PRT/M/2018 TENTANG PEMBANGUNAN BANGUNAN GEDUNG NEGARA (Vol. 5, Issue 1).
Ramadhan, M. A., & Maulana, A. (2020). Pemahaman Konsep BIM melalui Autodesk Revit bagi Guru SMK Teknik Bangunan se-Jabodetabek. Wikrama Parahita : Jurnal Pengabdian Masyarakat, 4(1), 47–52. https://doi.org/10.30656/jpmwp.v4i1.1886
Shafira Rizka Amalia dan Feriza Nadiar. (2025). Optimalisasi Quantity Material Take-Off (QMTO) Pekerjaan Struktural melalui Building Information Modeling (BIM) Berbasis Autodesk Revit Studi Kasus: Pondasi PS2 Bangunan Kliring Gedung Sementara Kantor Perwakilan Bank Indonesia (KPwBI) Tegal, Jurnal Multidisplin Saintek, Volume 9 No.
Suryapratama, R. Y., Purnomo, A., & Berliana, R. (2024). Analisa Perbandingan Pekerjaan Dinding Menggunakan Panel Precast dengan Konvensional dari Segi Kualitas, Waktu serta Biaya. Jurnal Pendidikan Tambusai, 8, 4547–4556. https://jptam.org/index.php/jptam/article/view/13081%0Ahttps://jptam.org/index.php/jptam/article/download/13081/10049
Tigauw, F. M., Aprilianto, F., & Santoso, H. T. (2023). Analisa Perhitungan Quantity Material Take-Off (QMTO) Struktur Bawah Jembatan Tipe Skew dengan Menggunakan BIM Autodesk Revit. Jurnal Inovasi Konstruksi, 2(2), 58–65. https://doi.org/10.56911/jik.v2i2.44
Refbacks
- There are currently no refbacks.